Works Contract covers all work execution is computed based on the value of Project Based on the calculation of the RAB. As an illustration of the building that will cost you next plan is to estimate the Implementation Work Package Volume Cost based on specifications of materials to be used. Differentiated by class of building:
1. | Simplified Class |
Calculated on the basis of floor area to be built with cost estimates range between IDR. 2.000.000, - / M2 up to IDR. 3,000,000, -/m2 (the floor area of buildings, cost estimates will be more expensive) | |
2. | Standard Class |
Calculated on the basis of floor area to be built with cost estimates range between IDR.3.000.000, - / M2 up to IDR. 4,000,000, -/m2 (the floor area of buildings, cost estimates will be more expensive) | |
3. | Luxury Class |
Calculated on the basis of floor area to be built with cost estimates range between IDR.4.000.000, - / M2 up to IDR. 5.000.000, -/m2 (the floor area of buildings, cost estimates will be more expensive) | |
approximate prices only apply to local bali |
Prices shown in the table above calculation is only a price estimation and not used as a reference in our offer but you can use to estimate home loan if you need funding through the Bank. For the price quote, we will calculate the actual value of the project based on the design and material specifications established.
In accordance with the Specification Working Class Materials Used There are in the table below
NO | WORK | SIMPLE CLASS | STANDARD CLASS | DELUXE KELAS |
1 | Foundation | Coral Stone, steel reinforced concrete, K | River stone, steel reinforced concrete, Tes | River Stone, Marking steel reinforced concrete |
2 | Wall | Concrete block, Plaster ,smooth plaster, “Vinilex” Paint | Concrete block, Plaster, smooth plaster, “Dulux” Paint | Brick, Plaster, smooth plater, ‘Dulux” Paint, Finishing Nature Stone,, interior/exterior), wood partition, panel carving stone/wood |
3 | Floor | Ceramic 30x30cm “Asia Tile” | Ceramic 40x40 “Platinum” | Terrazzo/Marmer/ Granite, Wood Parquette , Wood decking |
4 | Roof | Keruing Wood Frame, Roof Tile “Pejaten” | Frame easy steel Roof Tile Metal “zinc Alume” | Frame Easy steel , Roof Tile, Ceramic, sirap ulin, alang alang |
5 | Sills | Keruing Wood Frame, Coconut Wood | Camper Wood | Bangkirai wood oven, merbau oven, |
6 | Door | Double teak wood/megatik | Panil Door wood /Solid standard | Door Wood Special /panil/Solid/ Mirror |
7 | Plafond | Keruing Wood Frame,, Cover Gypsum 9 mm “Indal” | Keruing Metal Frame,, Cover Gypsum 9 mm “Jaya Board” | metal Furing, Gypsum 9 mm “jaya Board”, gap shadow |
8 | Sanitary | Ex Ina / equal | Ex Cina | Toto / Equal |
9 | Key & Handle | Ex Beniti/ equal | Ex dekson/Equal | Ex Albion/ Equal |
SYSTEMATIC PAYMENT CONTROL WORK
If the Image of Bali has been appointed as the executor of development then must pay a deposit of 30% of the value of project / contract price.
Payment of unity billings by 25% from wholesale price if the work has reached 30% and net installment payment of 25% of advances.
The second term of payment of 25% of wholesale prices if the work has reached 55% and reduced installment payment an advance of 25% of the advance. Payment of third installment amounting to 25% of the wholesale price if the work has reached 80% and net installment payment of 25% of the advances.
Payment of the fourth installment of 20% of the wholesale price if the work has reached 100% and net installment payment of 25% of advances
The fifth installment payments equal to 5% if the time limit has expired maintenance
If the Contract Work is to build a project from design is done by IMAGE BALI, so in this package for design costs already paid at the stage of the design process will be counted as part of the deposit for implementation of development, in other words the cost of design is considered free.
If you need a mortgage to finance the construction or renovation of your house, through the following table you can simulate your mortgage based on interest rates Bank of your choice.